Capital Energy Burst Aerator II
Tech IICapital Energy Weapon RigsCapital Energy Burst Aerator II — Tech II Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase a ship's energy turrets' rate of fire at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
12.78m ISK
90d Avg
12.28m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-15)
12.78m ISK
90d Average
12.28m ISK
90d High
13.30m ISK
90d Low
1.07m ISK
Avg Daily Volume
3
Variations(2)
Capital Energy Burst Aerator I
Tech I
Capital Energy Burst Aerator II
Tech II
Recent Destructions
View all →Revelation· Raskiainen Appas Yotosala · O4T-Z5
2.14bRevelation· Rinakot · Ignoitton
3.57bRevelation· Three EightsDead Already · Ahbazon
3.40bRevelation· Quarter Dead Already · Ahbazon
3.75bRevelation· NineSixteens Dead Already · Ahbazon
3.60bRevelation· Jean Loret · 1-SMEB
3.29bRevelation· Zoltan Simich · 1-SMEB
3.29bRevelation· Edward Yonge · 1-SMEB
3.28bRevelation· ZillowZild · Pain
3.71bRevelation· shlen · 1ZF-PJ
3.57bAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID31452
Group ID775
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1512.78m2
2026-08-1211.98m14
2026-08-0211.98m3
2026-07-2912.79m11
2026-07-2212.81m1
2026-07-2112.81m1
2026-07-0912.85m5
2026-07-0512.87m1
2026-06-2912.92m1
2026-06-2712.92m1
2026-06-2512.00m2
2026-06-2212.95m2
2026-06-1912.97m1
2026-06-1712.98m10
2026-06-1413.12m1
2026-06-1213.12m1
2026-06-1113.12m6
2026-06-1013.13m1
2026-06-0813.13m5
2026-06-0513.15m1
2026-06-0110.00m4
2026-05-2613.17m1
2026-05-2513.19m1
2026-05-241.07m1
2026-05-2013.30m1