Small Tracking Diagnostic Subroutines II
Tech IISmall Electronics Superiority RigsSmall Tracking Diagnostic Subroutines II — Tech II Rig Electronic Systems (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Rig Electronic Systems/Small Tracking Diagnostic Subroutines II
This ship modification is designed to increase the effectiveness of fitted weapon disruptors at the expense of shields.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Jita Price
3.48m ISK
90d Avg
2.89m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-10-01)
3.48m ISK
90d Average
2.89m ISK
90d High
3.50m ISK
90d Low
66.0k ISK
Avg Daily Volume
7
Variations(2)
Small Tracking Diagnostic Subroutines I
Tech I
Small Tracking Diagnostic Subroutines II
Tech II
Recent Destructions
View all →Crucifier Navy Issue· Klae's Ashford · Nennamaila
26.34mCrucifier· Lazertech · O31W-6
6.87mCrucifier Navy Issue· Klae's Ashford · Aldranette
26.98mSentinel· Doctorr TNT · J150533
39.95mSentinel· Dux Mortis · O-MCZR
47.80mCrucifier· KOTEHOK BETPA · J145916
18.75mHarpy· RinPoi · CVY-UC
51.09mCrucifier· Everyone Jr · O-2RNZ
14.87mSentinel· Dux Mortis · X-4WZD
39.43mSentinel· Malaketh Arran · J112309
36.37mAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID31352
Category ID7
Mass200 kg
Volume5 m³
Packaged Volume5 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-013.48m10
2026-09-303.48m3
2026-09-293.48m12
2026-09-273.49m1
2026-09-263.48m21
2026-09-253.48m1
2026-09-243.48m2
2026-09-233.48m6
2026-09-223.48m2
2026-09-203.49m10
2026-09-183.49m1
2026-09-173.49m4
2026-09-153.49m1
2026-09-143.49m1
2026-09-122.12m5
2026-09-113.49m4
2026-09-083.49m3
2026-09-06556.3k14
2026-09-053.50m14
2026-09-043.50m1
2026-09-033.50m2
2026-09-013.50m9
2026-08-292.55m10
2026-08-282.50m7
2026-08-271.69m3
2026-08-232.50m1
2026-08-183.00m4
2026-08-173.00m4
2026-08-163.00m5
2026-08-15367.7k21