Medium Inverted Signal Field Projector II
Tech IIMedium Electronics Superiority RigsMedium Inverted Signal Field Projector II — Tech II Rig Electronic Systems (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Electronics Superiority Rigs/Medium Inverted Signal Field Projector II
This ship modification is designed to increase the effectiveness of fitted remote sensor dampeners at the expense of shields.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Jita Price
9.95m ISK
90d Avg
8.13m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-08-19)
9.95m ISK
90d Average
8.13m ISK
90d High
24.97m ISK
90d Low
327.4k ISK
Avg Daily Volume
4
Variations(2)
Medium Inverted Signal Field Projector I
Tech I
Medium Inverted Signal Field Projector II
Tech II
Recent Destructions
View all →Arazu· RM Ryoko · XUDX-A
440.61mRook· Sev Khema · KED-2O
171.31mLachesis· Firebolt145 · Tartoken
268.30mLachesis· BlackMoonRailgun · MPPA-A
226.86mLachesis· fibular · 8G-2FP
291.48mLachesis· Insan1ty Anthar · Ohkunen
300.69mLachesis· FleetBeacon · U5-XW7
347.43mCelestis· Insan1ty Anthar · Ohkunen
37.20mLachesis· Nius Kincaid · 1-5GBW
173.73mLachesis· MissyandRocky · Aliette
721.54mAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID31270
Group ID786
Category ID7
Mass200 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-199.95m1
2026-08-179.98m1
2026-08-1610.03m1
2026-08-1510.23m1
2026-08-1310.85m2
2026-08-114.75m5
2026-08-1011.69m2
2026-08-0811.96m4
2026-08-073.50m1
2026-08-063.46m8
2026-08-053.43m1
2026-08-033.44m2
2026-08-023.45m1
2026-08-013.45m9
2026-07-303.45m1
2026-07-293.44m8
2026-07-283.30m1
2026-07-273.40m1
2026-07-263.43m2
2026-07-253.43m2
2026-07-243.44m1
2026-07-233.44m2
2026-07-213.45m1
2026-07-203.50m2
2026-07-193.50m18
2026-07-183.25m13
2026-07-173.46m46
2026-07-163.63m1
2026-07-154.30m5
2026-07-13330.9k1