Medium Inverted Signal Field Projector II
Tech IIMedium Electronics Superiority RigsMedium Inverted Signal Field Projector II — Tech II Rig Electronic Systems (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Electronics Superiority Rigs/Medium Inverted Signal Field Projector II
This ship modification is designed to increase the effectiveness of fitted remote sensor dampeners at the expense of shields.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Jita Price
13.87m ISK
90d Avg
6.75m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-07-05)
13.87m ISK
90d Average
6.75m ISK
90d High
24.97m ISK
90d Low
326.4k ISK
Avg Daily Volume
3
Variations(2)
Medium Inverted Signal Field Projector I
Tech I
Medium Inverted Signal Field Projector II
Tech II
Recent Destructions
View all →Lachesis· Mersar eva · Espigoure
263.42mArazu· Haus Alduin · Chardalane
189.96mLachesis· DarthChocula86 · C-N4OD
600.29mCelestis· F1ip · 15W-GC
102.68mLachesis· LDISSEXY · 9-MJVQ
194.50mLachesis· Gauzeee Military · 1-SMEB
174.83mLachesis· Nimgul · J112928
496.60mLachesis· Jason Aiderona · DT-PXH
348.36mLachesis· Matsikka Paaltomo · DO6H-Q
205.14mLachesis· NI SHERA · PF-346
382.69mAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID31270
Group ID786
Category ID7
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0513.87m5
2026-07-0314.45m3
2026-07-0215.49m1
2026-07-0115.54m3
2026-06-3015.77m2
2026-06-2817.05m5
2026-06-2718.32m2
2026-06-25330.1k1
2026-06-2410.03m2
2026-06-2319.82m2
2026-06-2217.38m4
2026-06-2119.89m3
2026-06-2012.02m22
2026-06-1919.95m1
2026-06-1724.26m2
2026-06-1624.75m1
2026-06-1524.82m1
2026-06-1424.94m4
2026-06-1324.97m1
2026-06-123.05m6
2026-06-113.05m3
2026-06-073.05m1
2026-06-063.05m2
2026-06-051.69m4
2026-06-043.06m1
2026-06-031.97m5
2026-06-023.06m1
2026-06-013.06m1
2026-05-313.06m1
2026-05-303.06m2