Medium Low Friction Nozzle Joints II
Tech IIMedium Astronautic RigsMedium Low Friction Nozzle Joints II — Tech II Rig Navigation (Module) — EVE Online item
This ship modification is designed to increase a ship's agility at the expense of armor amount.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Astronautics Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Astronautics Rigging skill.
Jita Price
17.91m ISK
90d Avg
17.94m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-07-04)
17.91m ISK
90d Average
17.94m ISK
90d High
24.32m ISK
90d Low
13.86m ISK
Avg Daily Volume
350
Variations(2)
Medium Low Friction Nozzle Joints I
Tech I
Medium Low Friction Nozzle Joints II
Tech II
Recent Destructions
View all →Mastodon· Nivek Storm · G9D-XW
212.78mProwler· DreadNaught II · Akora
250.07mTornado· Freak Hekard · IL-YTR
138.40mVictorieux Luxury Yacht· Volaron · M9U-75
328.74mMackinaw· Raven1004 Itinen · XS-K1O
247.47mCrane· Lois Amitrana · QSM-LM
159.26mCovetor· Kourmonen Sukki Fumimasa · YPW-M4
98.98mHulk· Inogainen Isu · YPW-M4
691.69mEpithal· Lucasian Thellere · J131808
71.23mEpithal· Shai'si · Tasti
89.90mAttributes
Structure HP40
Calibration Cost75
Reprocessing Materials
Properties
Type ID31173
Group ID782
Category ID7
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0417.91m517
2026-07-0317.86m289
2026-07-0218.16m430
2026-07-0118.81m235
2026-06-3019.20m221
2026-06-2919.77m274
2026-06-2820.04m502
2026-06-2720.96m278
2026-06-2621.34m334
2026-06-2520.70m335
2026-06-2420.56m262
2026-06-2320.53m389
2026-06-2220.66m434
2026-06-2120.76m578
2026-06-2020.98m453
2026-06-1922.35m323
2026-06-1822.50m274
2026-06-1719.63m451
2026-06-1619.73m427
2026-06-1519.95m552
2026-06-1420.76m321
2026-06-1322.30m265
2026-06-1222.97m211
2026-06-1123.78m212
2026-06-1023.91m297
2026-06-0918.82m253
2026-06-0817.96m233
2026-06-0717.97m349
2026-06-0617.79m360
2026-06-0517.80m258