Capital Low Friction Nozzle Joints I
Tech ICapital Astronautic RigsCapital Low Friction Nozzle Joints I — Tech I Rig Navigation (Module) — EVE Online item
This ship modification is designed to increase a ship's agility at the expense of armor amount.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Astronautics Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Astronautics Rigging skill.
Jita Price
32.91m ISK
90d Avg
35.95m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-26)
32.91m ISK
90d Average
35.95m ISK
90d High
47.61m ISK
90d Low
17.0k ISK
Avg Daily Volume
3
Variations(2)
Capital Low Friction Nozzle Joints I
Tech I
Capital Low Friction Nozzle Joints II
Tech II
Recent Destructions
View all →Bowhead· Grand-Admiral-Thrawn · Balle
1.37bRorqual· JordanAstone Astone · S-E6ES
11.05bArchon· Aleksandr650 Hilanen · Tabbetzur
3.40bThanatos· RUSTEREM77 · EFM-C4
5.58bBowhead· ChinatownInc · Zayi
1.48bMoros· hoohoohahee · Oberen
3.38bRevelation· Aiforte T · 4GYV-Q
5.03bCaiman· MsPalin · Ignoitton
60.32bRevelation· QinShang Stareine · VRH-H7
5.00bBowhead· Mistress Rose · Kheram
1.39bAttributes
Structure HP40
Calibration Cost50
Reprocessing Materials
Properties
Type ID31157
Group ID782
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2632.91m4
2026-08-2236.77m2
2026-08-1937.42m3
2026-08-1837.37m4
2026-08-1618.97m2
2026-08-1139.44m1
2026-08-0717.0k1
2026-08-0639.98m3
2026-08-0140.00m1
2026-07-3141.01m3
2026-07-2941.01m1
2026-07-2839.00m6
2026-07-2538.45m2
2026-07-2440.66m1
2026-07-2235.15m7
2026-07-1931.07m4
2026-07-1441.16m2
2026-07-1035.80m9
2026-07-0934.99m1
2026-07-0631.54m5
2026-07-0534.98m2
2026-07-0235.00m1
2026-07-0135.09m1
2026-06-3033.24m3
2026-06-2833.42m5
2026-06-2635.29m1
2026-06-2535.43m1
2026-06-2435.45m2
2026-06-2116.74m2
2026-06-2038.47m4