Capital Auxiliary Nano Pump II
Tech IICapital Armor RigsCapital Auxiliary Nano Pump II — Tech II Rig Armor (Module) — EVE Online item
This ship modification is designed to increase a ship's armor repairer repair amount at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Jita Price
399.07m ISK
90d Avg
519.02m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-09-29)
399.07m ISK
90d Average
519.02m ISK
90d High
721.05m ISK
90d Low
211.55m ISK
Avg Daily Volume
3
Variations(2)
Capital Auxiliary Nano Pump I
Tech I
Capital Auxiliary Nano Pump II
Tech II
Recent Destructions
View all →Thanatos· RedMoose927 · Aldranette
5.48bZirnitra· Kavai Rayth · J110117
9.35bMoros Navy Issue· battleangel69 · J110117
8.48bMoros Navy Issue· Bogdana Dallocort · Elore
7.97bMoros Navy Issue· Hensoza · Amamake
7.76bRevelation Navy Issue· CrackerC · Amamake
10.14bHubris· GATS HALF · Goudiyah
15.77bZirnitra· Maya Resurrectus · J151838
11.71bMoros Navy Issue· CrackerC · 9-980U
7.82bNinazu· Sotibra · V2-GZS
8.29bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31049
GroupRig Armor (773)
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-09-29399.07m3
2026-09-28401.97m3
2026-09-27404.70m3
2026-09-26410.45m4
2026-09-24415.30m1
2026-09-23417.80m2
2026-09-22420.13m3
2026-09-20427.45m2
2026-09-19431.47m3
2026-09-18406.30m7
2026-09-17437.92m5
2026-09-16445.30m1
2026-09-15448.70m2
2026-09-14455.70m1
2026-09-13458.30m1
2026-09-12463.30m1
2026-09-11469.20m4
2026-09-10472.60m2
2026-09-09478.20m4
2026-09-07486.20m2
2026-09-06488.00m1
2026-09-05493.40m3
2026-09-04498.15m2
2026-09-03503.65m2
2026-09-02505.40m2
2026-09-01507.76m5
2026-08-31511.73m3
2026-08-30514.60m4
2026-08-29459.46m7
2026-08-28438.17m3