Capital Explosive Armor Reinforcer I
Tech ICapital Armor RigsCapital Explosive Armor Reinforcer I — Tech I Rig Armor (Module) — EVE Online item
This ship modification is designed to increase a ship's armor explosive resistance at the expense of agility.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Jita Price
43.38m ISK
90d Avg
39.11m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-11)
43.38m ISK
90d Average
39.11m ISK
90d High
67.40m ISK
90d Low
385.2k ISK
Avg Daily Volume
3
Variations(2)
Capital Explosive Armor Reinforcer I
Tech I
Capital Explosive Armor Reinforcer II
Tech II
Recent Destructions
View all →Ninazu· Dru Mon · Ingunn
6.87bMoros· DAPT BELlDEP · Ontorn
4.01bNinazu· Sweden lady · Amamake
6.49bRevelation· fast ming · H-ADOC
3.96bNinazu· Louna Frenge · H-ADOC
6.36bRevelation Navy Issue· ricardi · QXQ-BA
7.59bNidhoggur· Kraoz Strapikon · Rafeme
4.52bRevelation· Nikola Zver · E-WMT7
5.10bRevelation Navy Issue· sussy baka prime · WK2F-Y
8.77bThanatos· Gravity Ginen · D-W7F0
2.84bAttributes
Structure HP40
Calibration Cost50
Reprocessing Materials
Properties
Type ID31013
GroupRig Armor (773)
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-1143.38m3
2026-10-1042.17m3
2026-10-0943.12m2
2026-10-0843.41m2
2026-10-0743.42m1
2026-10-0638.87m9
2026-10-0538.97m1
2026-10-0442.87m1
2026-10-0143.84m4
2026-09-3044.84m2
2026-09-2946.48m2
2026-09-2750.00m1
2026-09-2649.82m5
2026-09-2462.88m1
2026-09-2362.99m1
2026-09-2232.00m1
2026-09-2131.99m1
2026-09-1931.75m4
2026-09-1830.99m3
2026-09-1530.99m1
2026-09-1431.00m2
2026-09-1330.97m3
2026-09-1230.82m3
2026-09-1030.97m1
2026-09-0730.97m3
2026-09-0631.44m4
2026-09-05385.3k2
2026-08-3135.84m1
2026-08-3035.98m2
2026-08-2836.88m3