Dual 425mm AutoCannon II
Tech IILargeDual 425mm AutoCannon II — Tech II Projectile Weapon (Module) — EVE Online item
Combines the damage output of two 425mm intermediate-range autocannons.
Must be loaded with any of the following regular and advanced projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, Titanium Sabot, Barrage, Hail.
Must be loaded with any of the following regular and advanced projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, Titanium Sabot, Barrage, Hail.
Jita Price
1.22m ISK
90d Avg
1.55m ISK
Volume
20 m³
Base Price
605.2k ISK
Jita Market (90d)
Latest Price (2026-10-01)
1.22m ISK
90d Average
1.55m ISK
90d High
2.37m ISK
90d Low
1.00m ISK
Avg Daily Volume
41
Variations(10)
Dual 425mm AutoCannon I
Tech I
Dual 425mm 'Scout' Autocannon I
Tech I
Dual 425mm Carbine Repeating Cannon I
Tech I
Dual 425mm Gallium Machine Gun
Tech I
Dual 425mm Prototype Automatic Cannon
Tech I
Dual 425mm AutoCannon II
Tech II
Domination Dual 425mm Autocannon
Faction
Republic Fleet Dual 425mm Autocannon
Faction
Mizuro's Modified Dual 425mm AutoCannon
Officer
Gotan's Modified Dual 425mm AutoCannon
Officer
Recent Destructions
View all →Maelstrom· FooBot · Aldranette
190.16mTempest· Tivain · Sassecho
202.97mVargur· Blue Falcon13 · J122818
2.21bVargur· Vandi Hextrix · Evati
1.63bTornado· Ashandari · Amamake
98.14mTornado· maksim 777 · 5OJ-G2
167.24mTornado· maksim 777 · D7-ZAC
131.30mPraxis· Grey Veil · MSG-BZ
513.69mPanther· Kingdom Knight · Q0OH-V
1.23bTornado· Ashandari · Dal
140.03mRequired Skills
Attributes
Structure HP40
Powergrid Usage1375 MW
CPU Usage35 tf
Charge Size3
Charge Group83
Reprocessing Materials
Properties
Type ID2945
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Capacity5 m³
Portion Size1
Radius200 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-011.22m66
2026-09-301.34m13
2026-09-291.36m31
2026-09-281.26m51
2026-09-271.27m51
2026-09-261.21m42
2026-09-251.41m18
2026-09-241.33m17
2026-09-231.42m19
2026-09-221.42m18
2026-09-211.38m75
2026-09-201.30m46
2026-09-191.29m38
2026-09-181.24m17
2026-09-171.13m17
2026-09-161.30m25
2026-09-151.43m10
2026-09-141.43m122
2026-09-131.31m20
2026-09-121.34m23
2026-09-111.43m5
2026-09-101.43m8
2026-09-091.32m18
2026-09-081.22m431
2026-09-071.44m44
2026-09-061.44m52
2026-09-051.43m20
2026-09-041.42m41
2026-09-031.28m21
2026-09-021.42m20