Dual 180mm AutoCannon II
Tech IIMediumDual 180mm AutoCannon II — Tech II Projectile Weapon (Module) — EVE Online item
This dual 180mm autocannon is a simple but effective close combat weapon.
Must be loaded with any of the following regular and advanced projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, Titanium Sabot, Barrage, Hail.
Must be loaded with any of the following regular and advanced projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, Titanium Sabot, Barrage, Hail.
Jita Price
1.13m ISK
90d Avg
1.52m ISK
Volume
10 m³
Base Price
220.5k ISK
Jita Market (90d)
Latest Price (2026-08-28)
1.13m ISK
90d Average
1.52m ISK
90d High
2.53m ISK
90d Low
1.03m ISK
Avg Daily Volume
230
Variations(8)
Dual 180mm AutoCannon I
Tech I
Dual 180mm 'Scout' Autocannon I
Tech I
Dual 180mm Carbine Repeating Cannon I
Tech I
Dual 180mm Gallium Machine Gun
Tech I
Dual 180mm Prototype Automatic Cannon
Tech I
Dual 180mm AutoCannon II
Tech II
Domination Dual 180mm Autocannon
Faction
Republic Fleet Dual 180mm Autocannon
Faction
Recent Destructions
View all →Stabber Fleet Issue· Ghostsystem · Dal
114.34mStabber· Psycho Ex · Dal
35.91mScythe Fleet Issue· Sanja Uta · 4F6-VZ
76.16mScythe Fleet Issue· Bulldops · Eha
81.17mScythe Fleet Issue· lee en Cedoulain · FY0W-N
63.96mScythe Fleet Issue· Kolhoznik FAB · Vard
72.81mSleipnir· Erur · J165153
330.16mVagabond· Zoyya · Z-8Q65
431.80mIshtar· Bremen Osterholz · J135304
206.00mCyclone· fancies chen · AW1-2I
90.05mRequired Skills
Attributes
Structure HP40
Powergrid Usage88 MW
CPU Usage19 tf
Charge Size2
Charge Group83
Reprocessing Materials
Properties
Type ID2937
Group ID55
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity2.5 m³
Portion Size1
Radius20 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-281.13m197
2026-08-271.13m162
2026-08-261.13m159
2026-08-251.13m814
2026-08-241.13m140
2026-08-231.13m294
2026-08-221.13m256
2026-08-211.14m144
2026-08-201.14m252
2026-08-191.15m300
2026-08-181.16m182
2026-08-171.16m183
2026-08-161.17m190
2026-08-151.20m157
2026-08-141.21m207
2026-08-131.29m158
2026-08-121.30m261
2026-08-111.31m182
2026-08-101.31m291
2026-08-091.32m390
2026-08-081.32m237
2026-08-071.38m217
2026-08-061.38m238
2026-08-051.44m363
2026-08-041.46m217
2026-08-031.46m112
2026-08-021.50m201
2026-08-011.50m203
2026-07-311.52m127
2026-07-301.52m182