Large Projectile Locus Coordinator II
Tech IILarge Projectile Weapon RigsLarge Projectile Locus Coordinator II — Tech II Rig Projectile Weapon (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Projectile Weapon Rigs/Large Projectile Locus Coordinator II
This ship modification is designed to increase the optimal range of all projectile turrets at the expense of increased power grid need for projectile weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Jita Price
13.05m ISK
90d Avg
17.79m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-05-18)
13.05m ISK
90d Average
17.79m ISK
90d High
41.98m ISK
90d Low
1.40m ISK
Avg Daily Volume
5
Variations(2)
Large Projectile Locus Coordinator I
Tech I
Large Projectile Locus Coordinator II
Tech II
Recent Destructions
View all →Megathron· Sirtoh Omo Purvanen · Ami
281.67mMachariel· Arcanier · XV-MWG
1.02bMachariel· VoidRevelation · K8X-6B
3.28bMachariel· primalgamer · EIDI-N
1.09bMachariel· Mclaren231 · EIDI-N
1.91bTempest· TERKISH · EFM-C4
378.47mVargur· 1125 Ljw · 4-HWWF
1.02bVargur· 1126 Ljw Saken · 4-HWWF
1.02bMachariel· AHA GOLDLY · 4-HWWF
1.05bMachariel· Jeeves Korso · LW-YEW
1.95bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID26432
Group ID777
Category ID7
Mass200 kg
Volume20 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-1813.05m2
2026-05-1613.54m1
2026-05-1513.78m2
2026-05-1414.00m1
2026-05-111.40m1
2026-05-0914.73m12
2026-05-0814.78m5
2026-05-0415.84m1
2026-05-0315.90m1
2026-04-2916.94m5
2026-04-2816.96m1
2026-04-2617.91m1
2026-04-2517.99m1
2026-04-2418.42m1
2026-04-2318.45m3
2026-04-2014.95m5
2026-04-1914.33m5
2026-04-1611.41m2
2026-04-1012.41m2
2026-04-0812.41m2
2026-04-0411.20m2
2026-04-0112.00m1
2026-03-2712.06m37
2026-03-2611.99m8
2026-03-2411.99m3
2026-03-1523.64m2
2026-03-1323.97m48
2026-03-0731.71m3
2026-03-0339.82m1
2026-02-2541.95m2