Large Projectile Ambit Extension II
Tech IILarge Projectile Weapon RigsLarge Projectile Ambit Extension II — Tech II Rig Projectile Weapon (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Projectile Weapon Rigs/Large Projectile Ambit Extension II
This ship modification is designed to increase a ship's projectile turret accuracy falloff range at the expense of increased power grid need for projectile weapons.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Jita Price
10.54m ISK
90d Avg
12.55m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-08-16)
10.54m ISK
90d Average
12.55m ISK
90d High
14.30m ISK
90d Low
5.61m ISK
Avg Daily Volume
5
Variations(2)
Large Projectile Ambit Extension I
Tech I
Large Projectile Ambit Extension II
Tech II
Recent Destructions
View all →Vargur· ranko i · J114403
1.97bPanther· huanying Yatolila · UMI-KK
1.08bTempest· James Calver · H-5GUI
227.54mTempest· Andrew Lusionist · H-5GUI
220.63mVargur· Radar Tech Matt · Y-ORBJ
1.18bVargur· Sagittarius EG · Pator
2.38bMachariel· Odushioka Hinken · Jita
821.57mMachariel· Odushioka Hinken · Jita
817.91mMachariel· Artur Hawking · 5-NZNW
1.70bVargur· Hunter for Soul · J234928
2.64bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID26428
Group ID777
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1610.54m64
2026-08-1510.40m5
2026-08-1310.41m1
2026-08-1210.41m2
2026-08-1110.42m1
2026-08-1010.39m9
2026-08-0910.43m3
2026-08-0810.45m3
2026-08-0710.46m7
2026-08-0610.47m3
2026-08-0510.52m4
2026-08-0410.64m4
2026-08-0310.81m4
2026-08-0210.91m5
2026-08-0110.99m2
2026-07-2911.41m24
2026-07-2811.43m1
2026-07-2711.50m1
2026-07-2611.60m13
2026-07-259.78m3
2026-07-2312.31m7
2026-07-2212.31m1
2026-07-2112.34m4
2026-07-2012.29m20
2026-07-1912.52m1
2026-07-1812.53m9
2026-07-1712.76m4
2026-07-1612.96m4
2026-07-1513.09m3
2026-07-1413.22m3