Large Warhead Calefaction Catalyst II
Tech IILarge Missile Launcher RigsLarge Warhead Calefaction Catalyst II — Tech II Rig Launcher (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Missile Launcher Rigs/Large Warhead Calefaction Catalyst II
This ship modification is designed to increase missile damage at the expense of increased CPU requirements for launchers.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Jita Price
113.26m ISK
90d Avg
112.23m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-07-03)
113.26m ISK
90d Average
112.23m ISK
90d High
249.60m ISK
90d Low
78.89m ISK
Avg Daily Volume
11
Variations(2)
Large Warhead Calefaction Catalyst I
Tech I
Large Warhead Calefaction Catalyst II
Tech II
Recent Destructions
View all →Barghest· MeckaJIuH · 5V-Q1R
2.64bGolem· Marcel Weniger · Hageken
1.54bGolem· piterin · Uosusuokko
3.61bGolem· ASTi Naari · Sheroo
1.36bGolem· Suravikin · Apanake
1.32bGolem· ASTi Naari · Apanake
1.32bBarghest· Faustus Walter · 6-TYRX
1.31bGolem· Saucy Sarah · GJ0-OJ
1.33bWidow· Tao Kansene · WH-JCA
1.02bRaven· Leite Vokan · 6W-6O9
383.78mAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID26420
Group ID779
Category ID7
Mass200 kg
Volume20 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-03113.26m10
2026-07-02112.80m7
2026-07-01112.80m8
2026-06-30112.87m14
2026-06-29115.20m16
2026-06-28113.02m14
2026-06-27110.70m14
2026-06-26111.03m15
2026-06-25112.82m21
2026-06-24115.89m18
2026-06-23120.87m6
2026-06-22128.20m3
2026-06-21135.75m2
2026-06-20137.18m12
2026-06-19139.63m3
2026-06-18142.75m4
2026-06-17146.94m5
2026-06-16152.84m11
2026-06-15141.45m2
2026-06-14166.02m5
2026-06-13177.64m8
2026-06-12129.14m35
2026-06-11101.20m37
2026-06-10101.48m5
2026-06-09101.68m12
2026-06-0899.20m9
2026-06-07102.30m8
2026-06-06102.65m4
2026-06-05102.80m3
2026-06-04103.70m11