Large Warhead Calefaction Catalyst II
Tech IILarge Missile Launcher RigsLarge Warhead Calefaction Catalyst II — Tech II Rig Launcher (Module) — EVE Online item
This ship modification is designed to increase missile damage at the expense of increased CPU requirements for launchers.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Jita Price
87.39m ISK
90d Avg
98.38m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-10-01)
87.39m ISK
90d Average
98.38m ISK
90d High
134.10m ISK
90d Low
10.40m ISK
Avg Daily Volume
10
Variations(2)
Large Warhead Calefaction Catalyst I
Tech I
Large Warhead Calefaction Catalyst II
Tech II
Recent Destructions
View all →Barghest· Hamon Oiras Hanomaa · Tarta
1.79bGolem· jinkela I · Q61Y-F
1.99bGolem· Lastdance · Kurniainen
2.34bGolem· Ackc Gagarin · 4-GB14
1.31bGolem· Gulnn Kuha · W-16DY
1.17bGolem· Hara Igunen · Aldranette
3.10bGolem· Jormag Yolnakrin · 5KG-PY
3.02bGolem· edwin Oramara · EQWO-Y
1.45bGolem· Amara Koskanaiken · S-LHPJ
2.24bGolem· Moras Aihaken · Y-JKJ8
1.22bAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID26420
GroupRig Launcher (779)
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0187.39m5
2026-09-3087.54m4
2026-09-2987.59m3
2026-09-2875.29m16
2026-09-2773.67m17
2026-09-2673.66m10
2026-09-2573.66m10
2026-09-2473.66m8
2026-09-2373.64m5
2026-09-2273.66m5
2026-09-2173.66m16
2026-09-2073.68m25
2026-09-1973.79m12
2026-09-1873.98m5
2026-09-1777.94m3
2026-09-1685.94m6
2026-09-1587.69m6
2026-09-1488.55m3
2026-09-1385.10m15
2026-09-1289.01m10
2026-09-1189.05m10
2026-09-1089.07m12
2026-09-0964.99m6
2026-09-0888.90m11
2026-09-0789.47m10
2026-09-0689.58m6
2026-09-0584.03m14
2026-09-0489.77m24
2026-09-0390.82m3
2026-09-0292.76m2