Large Hybrid Collision Accelerator II
Tech IILarge Hybrid Weapon RigsLarge Hybrid Collision Accelerator II — Tech II Rig Hybrid Weapon (Module) — EVE Online item
This ship modification is designed to increase a ship's hybrid turret damage at the expense of increased power grid need for hybrid weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Jita Price
27.52m ISK
90d Avg
38.84m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-07-07)
27.52m ISK
90d Average
38.84m ISK
90d High
67.88m ISK
90d Low
5.29m ISK
Avg Daily Volume
5
Variations(2)
Large Hybrid Collision Accelerator I
Tech I
Large Hybrid Collision Accelerator II
Tech II
Recent Destructions
View all →Kronos· Onanen Oramara · 5-P1Y2
1.57bKronos· Zergudo · Murema
1.72bKronos· Von Seth · 33CE-7
1.67bKronos· Miniko Iska · J204350
2.17bMegathron· Nick Kg · J160941
271.00mKronos· jimistonez · Jita
1.12bKronos· Viva Ia vida · Hageken
1.03bVindicator· PicnicRick · 4-IT9G
1.13bApocalypse· Takuya Gogiko · Anchauttes
255.66mKronos· Reys Bayron · J124949
2.62bAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID26396
Group ID776
Category ID7
Mass200 kg
Volume20 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0727.52m6
2026-07-0627.57m4
2026-07-0527.68m2
2026-07-0427.80m8
2026-07-0327.88m3
2026-07-0228.03m3
2026-07-0128.13m1
2026-06-3028.19m5
2026-06-2928.20m2
2026-06-2828.41m8
2026-06-2728.58m7
2026-06-2628.76m3
2026-06-2528.80m2
2026-06-2428.86m3
2026-06-2328.90m8
2026-06-2228.90m2
2026-06-2128.57m3
2026-06-2028.38m15
2026-06-1928.39m8
2026-06-1828.44m2
2026-06-1728.18m24
2026-06-1521.10m3
2026-06-1429.04m7
2026-06-1329.09m3
2026-06-1229.18m4
2026-06-1129.30m2
2026-06-1029.41m4
2026-06-0929.68m3
2026-06-0829.75m2
2026-06-0729.88m1