Large Hybrid Burst Aerator II
Tech IILarge Hybrid Weapon RigsLarge Hybrid Burst Aerator II — Tech II Rig Hybrid Weapon (Module) — EVE Online item
This ship modification is designed to increase a ship's hybrid turret rate of fire at the expense of increased power grid need for hybrid weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Jita Price
57.92m ISK
90d Avg
38.65m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-08-16)
57.92m ISK
90d Average
38.65m ISK
90d High
170.50m ISK
90d Low
16.97m ISK
Avg Daily Volume
11
Variations(2)
Large Hybrid Burst Aerator I
Tech I
Large Hybrid Burst Aerator II
Tech II
Recent Destructions
View all →Kronos· Vladislav KozloF · J131802
1.61bKronos· Odissey Laertovich · Dantbeinn
5.46bHyperion· extrasiteggplant · J151757
305.05mKronos· king potato 07 · Hogimo
2.51bKronos· Xing kaos · O-LR1H
1.36bKronos· Delilah Doe · HE5T-A
1.36bKronos· Calne Sanchez · J132309
1.49bKronos· Fabian Akbar · U-HYMT
2.06bMegathron Navy Issue· Taylor Estemaire · Vlillirier
551.99mMegathron· Heretics Must Die · Hadozeko
368.15mAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID26394
Group ID776
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1657.92m30
2026-08-1558.16m3
2026-08-1458.24m7
2026-08-1358.39m5
2026-08-1258.57m6
2026-08-1158.69m10
2026-08-1058.83m6
2026-08-0959.10m5
2026-08-0846.80m2
2026-08-0760.91m5
2026-08-0647.13m20
2026-08-0544.77m3
2026-08-0443.21m6
2026-08-0353.80m2
2026-08-0263.10m9
2026-08-0172.84m5
2026-07-3189.33m2
2026-07-30112.21m7
2026-07-2939.87m5
2026-07-2839.13m11
2026-07-2737.64m13
2026-07-2636.85m9
2026-07-2534.64m10
2026-07-2434.47m13
2026-07-2334.52m16
2026-07-2234.55m14
2026-07-2134.57m14
2026-07-2034.57m23
2026-07-1935.79m11
2026-07-1836.24m8