Large Nanobot Accelerator II
Tech IILarge Armor RigsLarge Nanobot Accelerator II — Tech II Rig Armor (Module) — EVE Online item
This ship modification is designed to reduce a ship's armor repair cycle duration at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Jita Price
78.47m ISK
90d Avg
88.01m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-10-08)
78.47m ISK
90d Average
88.01m ISK
90d High
103.30m ISK
90d Low
61.59m ISK
Avg Daily Volume
11
Variations(2)
Large Nanobot Accelerator I
Tech I
Large Nanobot Accelerator II
Tech II
Recent Destructions
View all →Typhoon· Jovkl1010 · 5-P1Y2
287.79mKronos· DesignerW · Otsasai
1.13bPaladin· Micle Niam · Avenod
1.58bKronos· Capt Harston · Mara
1.66bKronos· Sam Slipstream · Klogori
2.50bKronos· RedMoose927 · Aldranette
1.72bKronos· zzzmixazz3 · J130125
1.61bKronos· canoneerT · Ontorn
1.54bPaladin· pikapikaqio · Hagilur
5.05bLeshak· Der Coeter · Uosusuokko
1.38bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID26296
GroupRig Armor (773)
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0878.47m15
2026-10-0778.47m9
2026-10-0678.76m20
2026-10-0578.91m14
2026-10-0479.24m13
2026-10-0379.73m11
2026-10-0279.95m14
2026-10-0179.36m9
2026-09-3079.43m9
2026-09-2980.44m7
2026-09-2880.61m3
2026-09-2780.80m5
2026-09-2681.14m8
2026-09-2581.39m1
2026-09-2481.69m4
2026-09-2380.82m22
2026-09-2282.04m73
2026-09-2182.34m5
2026-09-2082.98m8
2026-09-1983.06m6
2026-09-1883.40m11
2026-09-1783.58m2
2026-09-1683.88m4
2026-09-1584.05m7
2026-09-1484.08m6
2026-09-1382.73m12
2026-09-1282.74m2
2026-09-1181.77m16
2026-09-1081.88m14
2026-09-0981.84m16