Large Targeting System Subcontroller I
Tech ILarge Targeting RigsLarge Targeting System Subcontroller I — Tech I Rig Targeting (Module) — EVE Online item
This ship modification is designed to increase a ship's targeting speed at the expense of shields.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Jita Price
5.64m ISK
90d Avg
5.96m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-10-11)
5.64m ISK
90d Average
5.96m ISK
90d High
14.00m ISK
90d Low
502.7k ISK
Avg Daily Volume
5
Variations(2)
Large Targeting System Subcontroller I
Tech I
Large Targeting System Subcontroller II
Tech II
Recent Destructions
View all →Maelstrom· Awsur Darine · RO-0PZ
238.18mMegathron· shifanda001 · WBR5-R
215.09mPraxis· Sert Ottug · G9D-XW
297.29mMaelstrom· Ram Jah · B-7DFU
217.16mAbaddon· Reeeeq · Perimeter
269.17mPraxis· Sert Ottug · Perimeter
396.38mKronos· Avenged37 · V6-NY1
1.88bSin· Fomeckblot · Cumemare
799.22mVargur· Tianchao Small gray · 4-HWWF
990.67mRaven· Bad Bunny II · Decon
376.06mAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID26100
GroupRig Targeting (1234)
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-115.64m4
2026-10-105.64m4
2026-10-095.65m5
2026-10-075.65m2
2026-10-065.65m3
2026-10-055.65m6
2026-10-035.64m9
2026-10-015.63m1
2026-09-295.63m10
2026-09-275.63m16
2026-09-265.64m3
2026-09-255.65m1
2026-09-245.65m3
2026-09-225.66m1
2026-09-215.66m8
2026-09-205.66m12
2026-09-185.69m9
2026-09-175.70m1
2026-09-155.71m10
2026-09-145.72m3
2026-09-135.73m4
2026-09-125.76m1
2026-09-105.79m1
2026-09-095.84m7
2026-09-084.65m4
2026-09-075.89m4
2026-09-065.99m1
2026-09-046.46m4
2026-09-036.49m1
2026-09-029.99m3