Large Projectile Collision Accelerator I
Tech ILarge Projectile Weapon RigsLarge Projectile Collision Accelerator I — Tech I Rig Projectile Weapon (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Projectile Weapon Rigs/Large Projectile Collision Accelerator I
This ship modification is designed to increase a ship's projectile turret damage output at the expense of increased power grid need for projectile weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Jita Price
1.28m ISK
90d Avg
1.24m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-08-26)
1.28m ISK
90d Average
1.24m ISK
90d High
1.39m ISK
90d Low
511.7k ISK
Avg Daily Volume
4
Variations(2)
Large Projectile Collision Accelerator I
Tech I
Large Projectile Collision Accelerator II
Tech II
Recent Destructions
View all →Maelstrom· Jacky Nolen · ZXJ-71
221.08mTempest· Ictali Batzki · J153627
247.91mMaelstrom· Ivenckbrault Actault · Hek
197.83mMaelstrom· Ivenckbrault Actault · J214654
189.25mPraxis· Anika Heluene · Samanuni
310.37mVargur· Axlis · AZA-QE
1.46bVargur· darin ifrim · C2X-M5
1.16bTempest· Dassen Borss · 7-UH4Z
226.28mVargur· moral sin · J110841
2.32bVargur· Turinae · Amsen
2.03bAttributes
Structure HP40
Calibration Cost200
Reprocessing Materials
Properties
Type ID26048
Group ID777
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-261.28m1
2026-08-251.28m1
2026-08-231.28m1
2026-08-221.28m5
2026-08-211.28m1
2026-08-191.28m2
2026-08-171.28m3
2026-08-161.28m1
2026-08-151.28m3
2026-08-141.28m2
2026-08-131.28m3
2026-08-12520.9k5
2026-08-111.28m1
2026-08-10520.7k3
2026-08-091.29m1
2026-08-081.29m10
2026-08-071.29m20
2026-08-061.29m3
2026-08-051.29m2
2026-08-041.29m3
2026-08-031.29m2
2026-08-021.29m1
2026-08-011.29m1
2026-07-301.18m7
2026-07-291.29m1
2026-07-271.29m2
2026-07-26808.0k8
2026-07-251.29m3
2026-07-241.29m3
2026-07-231.10m1