Large Bay Loading Accelerator I
Tech ILarge Missile Launcher RigsLarge Bay Loading Accelerator I — Tech I Rig Launcher (Module) — EVE Online item
This ship modification is designed to increase a ship's missile launchers' rate of fire at the expense of increased CPU requirements for launchers.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Jita Price
3.99m ISK
90d Avg
4.29m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-05-28)
3.99m ISK
90d Average
4.29m ISK
90d High
5.42m ISK
90d Low
2.02m ISK
Avg Daily Volume
12
Variations(2)
Large Bay Loading Accelerator I
Tech I
Large Bay Loading Accelerator II
Tech II
Recent Destructions
View all →Praxis· Miohanami · J212812
355.04mPraxis· Soudanie Warin Nardieu · Akora
259.15mRaven· Lazlax · Abune
321.77mTyphoon· MCefhfe123 · 1I6F-9
239.09mPraxis· Abe Sanchez · Balle
270.21mRaven Navy Issue· Leolver Ordor Askulf · Onnamon
707.78mPraxis· Krelk Amelana · Khopa
219.89mRaven· Coldhard213 · Hentogaira
225.21mWidow· Shinobu Re · D-3GIQ
974.00mPraxis· DyIdk · Iyen-Oursta
231.67mAttributes
Structure HP40
Calibration Cost200
Reprocessing Materials
Properties
Type ID26026
Group ID779
Category ID7
Mass200 kg
Volume20 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-283.99m15
2026-05-273.87m15
2026-05-263.87m27
2026-05-253.91m10
2026-05-243.54m15
2026-05-233.80m19
2026-05-223.89m15
2026-05-213.37m7
2026-05-203.89m7
2026-05-193.88m7
2026-05-183.88m15
2026-05-173.88m27
2026-05-163.88m12
2026-05-153.88m5
2026-05-143.59m35
2026-05-133.42m4
2026-05-123.88m5
2026-05-113.88m7
2026-05-103.47m9
2026-05-093.89m3
2026-05-083.89m10
2026-05-073.89m5
2026-05-063.89m10
2026-05-053.89m2
2026-05-043.89m7
2026-05-033.89m31
2026-05-023.58m6
2026-05-013.52m10
2026-04-303.89m2
2026-04-293.89m6