Large Hybrid Metastasis Adjuster I
Tech ILarge Hybrid Weapon RigsLarge Hybrid Metastasis Adjuster I — Tech I Rig Hybrid Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's hybrid turrets at the expense of increased power grid need for hybrid weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Jita Price
7.86m ISK
90d Avg
10.97m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-05-28)
7.86m ISK
90d Average
10.97m ISK
90d High
17.68m ISK
90d Low
101.1k ISK
Avg Daily Volume
2
Variations(2)
Large Hybrid Metastasis Adjuster I
Tech I
Large Hybrid Metastasis Adjuster II
Tech II
Recent Destructions
View all →Kronos· Orion Kerenskey · 7F-2FB
984.41mRokh· love sha · D-PNP9
188.51mKronos· Wiick3d · Dodixie
1.81bKronos· Grom Ciao · Sheroo
1.38bRokh· Inota Vuri Kasenumi · Aurohunen
186.77mKronos· Xion Neko · 2-84WC
1.01bKronos· Old Buckar00 · RP2-OQ
1.05bRokh· Zarus Calin Bloodborn · J132009
242.10mRokh· Zarus Calin Bloodborn · J132009
249.85mRokh· Lady Am · Vlillirier
295.61mAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID26002
Group ID776
Category ID7
Mass200 kg
Volume20 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-287.86m1
2026-05-277.86m2
2026-05-267.87m1
2026-05-237.87m1
2026-05-227.87m2
2026-05-215.29m3
2026-05-197.89m2
2026-05-177.89m3
2026-05-167.89m1
2026-05-157.89m2
2026-05-124.00m2
2026-05-097.89m1
2026-05-087.89m1
2026-05-066.00m1
2026-05-057.90m3
2026-05-047.90m2
2026-05-027.95m3
2026-05-017.95m2
2026-04-297.95m4
2026-04-284.03m2
2026-04-278.00m1
2026-04-268.00m3
2026-04-258.00m1
2026-04-248.48m1
2026-04-228.48m1
2026-04-209.00m6
2026-04-199.00m11
2026-04-189.00m1
2026-04-179.00m1
2026-04-1512.76m3