Large Energy Collision Accelerator I
Tech ILarge Energy Weapon RigsLarge Energy Collision Accelerator I — Tech I Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the damage output of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
1.86m ISK
90d Avg
2.06m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-10-01)
1.86m ISK
90d Average
2.06m ISK
90d High
3.29m ISK
90d Low
100.0k ISK
Avg Daily Volume
8
Variations(2)
Large Energy Collision Accelerator I
Tech I
Large Energy Collision Accelerator II
Tech II
Recent Destructions
View all →Paladin· Revman Zim · DBRN-Z
5.06bPaladin· Bad Girll · BR-N97
3.06bNightmare· Hroovitnir · C-J6MT
1.30bPaladin· Levino85 · U-HYMT
3.00bPaladin· Hiroshima Bob · RNF-YH
1.09bRedeemer· KIddsis Wang · F2OY-X
917.96mPaladin· Levino85 · IS-R7P
1.96bApocalypse Navy Issue· Kyousuke777 · J145645
674.32mApocalypse· Barkura Kane · J112309
331.34mApocalypse· Dominik Dupstep · J112309
305.77mAttributes
Structure HP40
Calibration Cost200
Reprocessing Materials
Properties
Type ID25980
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-011.86m4
2026-09-301.88m3
2026-09-291.82m21
2026-09-261.89m4
2026-09-24994.8k2
2026-09-231.89m1
2026-09-221.89m3
2026-09-201.89m3
2026-09-191.89m7
2026-09-181.89m1
2026-09-171.89m4
2026-09-161.89m1
2026-09-151.89m1
2026-09-141.44m4
2026-09-131.88m2
2026-09-121.87m1
2026-09-111.87m3
2026-09-091.43m4
2026-09-081.87m1
2026-09-071.88m5
2026-09-061.88m1
2026-09-041.88m1
2026-09-031.88m3
2026-09-021.88m1
2026-09-011.88m1
2026-08-311.88m2
2026-08-301.88m1
2026-08-291.88m3
2026-08-26990.0k4
2026-08-251.88m1