Large Energy Burst Aerator I
Tech ILarge Energy Weapon RigsLarge Energy Burst Aerator I — Tech I Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase a ship's energy turrets' rate of fire at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
2.04m ISK
90d Avg
2.17m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-10-01)
2.04m ISK
90d Average
2.17m ISK
90d High
2.90m ISK
90d Low
209.0k ISK
Avg Daily Volume
4
Variations(2)
Large Energy Burst Aerator I
Tech I
Large Energy Burst Aerator II
Tech II
Recent Destructions
View all →Apocalypse· 2no 0528 · J111629
223.57mApocalypse Navy Issue· Giftson2310 · Emsar
703.03mApocalypse· YukiSolo · Sheroo
266.36mApocalypse· YukiSolo · Avyuh
277.69mPaladin· Pepper Penken · 4-07MU
2.12bPaladin· Lord Arody · OSW-0P
1.41bAbaddon· Dedushka-Zapadlo · J162632
202.16mPaladin· Ram La Phi · Wuos
2.46bAbaddon· Lucas Parker E · Kamela
177.79mApocalypse· are151 · Seshala
255.91mAttributes
Structure HP40
Calibration Cost200
Reprocessing Materials
Properties
Type ID25978
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-012.04m2
2026-09-302.04m2
2026-09-292.05m1
2026-09-272.05m1
2026-09-262.05m2
2026-09-252.05m2
2026-09-242.06m1
2026-09-222.06m2
2026-09-212.07m1
2026-09-202.07m1
2026-09-191.86m9
2026-09-182.07m2
2026-09-172.07m1
2026-09-16219.2k1
2026-09-152.07m1
2026-09-141.15m2
2026-09-132.07m4
2026-09-122.07m1
2026-09-112.07m2
2026-09-092.07m2
2026-09-082.07m1
2026-09-072.07m2
2026-09-062.08m1
2026-09-052.08m1
2026-09-042.08m2
2026-09-022.08m1
2026-09-012.08m2
2026-08-312.08m1
2026-08-302.08m2
2026-08-292.08m2