Large Energy Locus Coordinator I
Tech ILarge Energy Weapon RigsLarge Energy Locus Coordinator I — Tech I Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the optimal range of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
1.73m ISK
90d Avg
1.36m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-10-04)
1.73m ISK
90d Average
1.36m ISK
90d High
1.80m ISK
90d Low
0 ISK
Avg Daily Volume
7
Variations(2)
Large Energy Locus Coordinator I
Tech I
Large Energy Locus Coordinator II
Tech II
Recent Destructions
View all →Paladin· McLear · Erila
1.28bApocalypse· Nanbu Kyosuke · Hikkoken
224.10mApocalypse· Collicalle Audeles · Hikkoken
224.10mApocalypse Navy Issue· Clay Katzmarek · HZFJ-M
482.89mApocalypse· Smaugg · Enaluri
218.96mApocalypse· Heretics Must Die · B6-XE8
241.23mApocalypse· chenfengmuyu · B-7DFU
201.92mApocalypse Navy Issue· Isgaren The Faithful · Sagain
434.84mApocalypse· Aralasma Myn Kashuken · 0-G8NO
221.87mNightmare· L0SER18q · IKTD-P
2.18bAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID25972
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-041.73m9
2026-10-011.43m5
2026-09-301.73m9
2026-09-291.73m4
2026-09-281.73m18
2026-09-271.74m1
2026-09-26548.6k5
2026-09-251.74m6
2026-09-24251.3k1
2026-09-221.74m1
2026-09-211.74m2
2026-09-201.74m11
2026-09-191.75m3
2026-09-181.75m2
2026-09-171.76m2
2026-09-161.78m6
2026-09-141.78m2
2026-09-131.80m1
2026-09-121.80m24
2026-09-111.80m5
2026-09-101.03m2
2026-09-091.80m5
2026-09-081.80m21
2026-09-071.80m2
2026-09-061.80m45
2026-09-021.80m1
2026-09-011.78m17
2026-08-311.50m3
2026-08-301.79m9
2026-08-291.80m40