'Knight' Medium Remote Capacitor Transmitter
StorylineMedium'Knight' Medium Remote Capacitor Transmitter — Storyline Remote Capacitor Transmitter (Module) — EVE Online item
Market/Ship Equipment/Engineering Equipment/Remote Capacitor Transmitters/'Knight' Medium Remote Capacitor Transmitter
Transfers capacitor energy to another ship.
Jita Price
3.89m ISK
90d Avg
2.43m ISK
Volume
10 m³
Base Price
30.0k ISK
Jita Market (90d)
Latest Price (2026-08-22)
3.89m ISK
90d Average
2.43m ISK
90d High
3.90m ISK
90d Low
1.01m ISK
Avg Daily Volume
8
Variations(13)
Medium Remote Capacitor Transmitter I
Tech I
Medium Radiative Scoped Remote Capacitor Transmitter
Tech I
Medium Inductive Compact Remote Capacitor Transmitter
Tech I
Medium Remote Capacitor Transmitter II
Tech II
'Knight' Medium Remote Capacitor Transmitter
Storyline
Imperial Navy Medium Remote Capacitor Transmitter
Faction
Nija's Modified Medium Remote Capacitor Transmitter
Officer
Corpum C-Type Medium Remote Capacitor Transmitter
Deadspace
Corpum B-Type Medium Remote Capacitor Transmitter
Deadspace
Corpum A-Type Medium Remote Capacitor Transmitter
Deadspace
Centum C-Type Medium Remote Capacitor Transmitter
Deadspace
Centum B-Type Medium Remote Capacitor Transmitter
Deadspace
Centum A-Type Medium Remote Capacitor Transmitter
Deadspace
Recent Destructions
View all →Osprey· Matteo Garrone · J134301
31.85mAugoror· Vileitha · Lantorn
56.95mNestor· Onyx Orbit · Oyeman
1.46bRodiva· HARUSARI · J160941
94.45mRodiva· HARUDAY · J160941
91.57mOsprey· Twan Molenaar · Siseide
97.83mAugoror· Teqq Land · Auga
138.68mBasilisk· URC DARKSTAR · PX-IHN
293.58mBasilisk· UFC DARKSTAR · PX-IHN
293.58mBasilisk· UCR DARKSTAR · PX-IHN
293.58mRequired Skills
Attributes
Activation Cost146.0 GJ
Structure HP40
Powergrid Usage68 MW
CPU Usage30 tf
Cycle Time5.0s
Reprocessing Materials
Properties
Type ID23854
Group ID67
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius1,000 m
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-223.89m14
2026-08-181.11m2
2026-08-143.89m12
2026-08-133.88m2
2026-08-122.78m5
2026-08-093.89m2
2026-08-083.49m7
2026-08-063.89m6
2026-08-053.89m12
2026-08-043.89m1
2026-08-033.89m1
2026-08-013.33m5
2026-07-303.89m15
2026-07-293.89m2
2026-07-283.89m3
2026-07-263.89m1
2026-07-243.89m2
2026-07-222.97m42
2026-07-192.51m5
2026-07-182.10m20
2026-07-141.50m3
2026-07-131.47m4
2026-07-121.29m9
2026-07-111.27m3
2026-07-101.34m9
2026-07-091.33m1
2026-07-081.31m44
2026-07-071.33m10
2026-07-061.22m12
2026-07-041.01m4