'Knight' Medium Remote Capacitor Transmitter
StorylineMedium'Knight' Medium Remote Capacitor Transmitter — Storyline Remote Capacitor Transmitter (Module) — EVE Online item
Market/Ship Equipment/Engineering Equipment/Remote Capacitor Transmitter/'Knight' Medium Remote Capacitor Transmitter
Transfers capacitor energy to another ship.
Jita Price
4.25m ISK
90d Avg
3.61m ISK
Volume
10 m³
Base Price
30.0k ISK
Jita Market (90d)
Latest Price (2026-10-06)
4.25m ISK
90d Average
3.61m ISK
90d High
7.50m ISK
90d Low
1.01m ISK
Avg Daily Volume
6
Variations(13)
Medium Remote Capacitor Transmitter I
Tech I
Medium Radiative Scoped Remote Capacitor Transmitter
Tech I
Medium Inductive Compact Remote Capacitor Transmitter
Tech I
Medium Remote Capacitor Transmitter II
Tech II
'Knight' Medium Remote Capacitor Transmitter
Storyline
Imperial Navy Medium Remote Capacitor Transmitter
Faction
Nija's Modified Medium Remote Capacitor Transmitter
Officer
Corpum C-Type Medium Remote Capacitor Transmitter
Deadspace
Corpum B-Type Medium Remote Capacitor Transmitter
Deadspace
Corpum A-Type Medium Remote Capacitor Transmitter
Deadspace
Centum C-Type Medium Remote Capacitor Transmitter
Deadspace
Centum B-Type Medium Remote Capacitor Transmitter
Deadspace
Centum A-Type Medium Remote Capacitor Transmitter
Deadspace
Recent Destructions
View all →Augoror· Zahra en Distel · Sujarento
53.30mAugoror· Sahro en Distel · Sujarento
53.30mAugoror· Azra en Distel · Sujarento
53.30mOsprey· UCR DARKSTAR · Hysera
87.81mOsprey· UCF DARKSTAR · Heydieles
158.10mOsprey· URC DARKSTAR · Heydieles
57.93mOsprey· UCR DARKSTAR · Heydieles
59.30mAugoror· zarkeCafec · Hadozeko
73.93mOsprey· HARUSARI · J134102
31.74mOsprey· HARUDAY · J134102
31.74mRequired Skills
Attributes
Activation Cost146.0 GJ
Structure HP40
Powergrid Usage68 MW
CPU Usage30 tf
Cycle Time5.0s
Reprocessing Materials
Properties
Type ID23854
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius1,000 m
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-064.25m9
2026-10-053.83m9
2026-10-043.74m27
2026-10-023.80m4
2026-09-281.20m5
2026-09-263.91m15
2026-09-253.90m1
2026-09-241.20m2
2026-09-192.75m2
2026-09-181.20m1
2026-09-174.30m1
2026-09-154.38m1
2026-09-144.38m1
2026-09-123.40m8
2026-09-114.00m8
2026-09-094.40m5
2026-09-074.50m2
2026-09-061.20m1
2026-09-053.60m2
2026-09-046.44m1
2026-09-026.74m1
2026-09-016.99m1
2026-08-311.20m3
2026-08-307.49m5
2026-08-297.49m1
2026-08-267.50m2
2026-08-253.94m12
2026-08-231.67m5
2026-08-223.89m14
2026-08-181.11m2