'Hooligan' Heavy Ion Blaster I
StorylineMedium'Hooligan' Heavy Ion Blaster I — Storyline Hybrid Weapon (Module) — EVE Online item
Particle blasters operate on a similar principle as the railgun except they fire a magnetically contained ball of subatomic particles. No other turret class can match the sheer destructive power of particle blasters, but due to the rapid dispersion of the containment field, it also has the worst range of all turrets.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
2.08m ISK
90d Avg
3.29m ISK
Volume
10 m³
Base Price
90.0k ISK
Jita Market (90d)
Latest Price (2026-10-04)
2.08m ISK
90d Average
3.29m ISK
90d High
4.85m ISK
90d Low
2.02m ISK
Avg Daily Volume
7
Variations(9)
Heavy Ion Blaster I
Tech I
Modal Ion Particle Accelerator I
Tech I
Limited Ion Blaster I
Tech I
Regulated Ion Phase Cannon I
Tech I
Anode Ion Particle Cannon I
Tech I
Heavy Ion Blaster II
Tech II
'Hooligan' Heavy Ion Blaster I
Storyline
Shadow Serpentis Heavy Ion Blaster
Faction
Federation Navy Heavy Ion Blaster
Faction
Recent Destructions
View all →Vexor Navy Issue· Remurus · B6-XE8
101.09mVexor Navy Issue· ConsumerComment · J220950
102.13mVexor Navy Issue· Vesbin · Hagilur
156.76mVexor Navy Issue· Vesbin · Ahbazon
357.27mFerox Navy Issue· niza X · Aeschee
193.99mVexor Navy Issue· Vesbin · J105017
105.33mProteus· Byatch · Okagaiken
542.96mVexor Navy Issue· Vesbin · Auga
143.39mVexor· Mullweker · Murethand
51.46mVexor Navy Issue· Vesbin · J133218
87.22mRequired Skills
Attributes
Activation Cost3.3 GJ
Structure HP40
Powergrid Usage119 MW
CPU Usage22 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID22907
GroupHybrid Weapon (74)
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity1.5 m³
Portion Size1
Radius100 m
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-042.08m6
2026-09-222.07m2
2026-09-183.89m6
2026-09-163.90m3
2026-09-102.07m3
2026-09-072.07m3
2026-09-014.77m3
2026-08-233.42m10
2026-08-212.04m3
2026-08-194.84m3
2026-08-182.04m6
2026-08-153.94m6
2026-08-094.85m3
2026-08-084.84m10
2026-08-074.21m29
2026-08-053.84m3
2026-08-033.84m3
2026-07-293.65m4
2026-07-273.01m2
2026-07-263.98m35
2026-07-192.03m1
2026-07-172.75m8
2026-07-163.60m2
2026-07-152.74m10
2026-07-133.41m3
2026-07-122.03m5
2026-07-112.92m10
2026-07-103.35m3