425mm Medium 'Jolt' Autocannon I
StorylineMedium425mm Medium 'Jolt' Autocannon I — Storyline Projectile Weapon (Module) — EVE Online item
The 425mm is a behemoth that will inflict severe damage on most cruisers and frigates in short-range battles.
Must be loaded with any of the following projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, or Titanium Sabot.
Must be loaded with any of the following projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, or Titanium Sabot.
Jita Price
2.40m ISK
90d Avg
2.99m ISK
Volume
10 m³
Base Price
90.0k ISK
Jita Market (90d)
Latest Price (2026-09-30)
2.40m ISK
90d Average
2.99m ISK
90d High
4.10m ISK
90d Low
983.1k ISK
Avg Daily Volume
6
Variations(11)
425mm AutoCannon I
Tech I
425mm Medium 'Scout' Autocannon I
Tech I
425mm Medium Carbine Repeating Cannon I
Tech I
425mm Medium Gallium Machine Gun
Tech I
425mm Medium Prototype Automatic Cannon
Tech I
425mm AutoCannon II
Tech II
Polarized 425mm AutoCannon
Tech II
425mm Medium 'Jolt' Autocannon I
Storyline
Domination 425mm Autocannon
Faction
Republic Fleet 425mm Autocannon
Faction
Sila's Modified 425mm Autocannon
Officer
Recent Destructions
View all →Cenotaph· DeathlessNo0b · PF-346
631.90mProteus· Unforgiven21212 · Tama
883.57mCenotaph· Nitsuj Dub · J230242
632.26mLoki· Bjorn22V · Fihrneh
1.35bStabber Fleet Issue· Augustus Amogus · Tama
706.81mStabber· FR33RID3R Kalsonzul · Tama
34.85mStabber· W1ng Chung · Y-UO9U
46.26mStabber Fleet Issue· zeroskillz Arnolles · Oto
72.44mProteus· Unforgiven21212 · J134800
1.03bVagabond· spinnock · HIK-MC
243.62mRequired Skills
Attributes
Structure HP40
Powergrid Usage126 MW
CPU Usage20 tf
Charge Size2
Charge Group83
Reprocessing Materials
Properties
Type ID21551
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity1.5 m³
Portion Size1
Radius20 m
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-09-302.40m5
2026-09-291.15m8
2026-09-282.83m5
2026-09-273.73m25
2026-09-243.75m5
2026-09-233.09m4
2026-09-223.74m4
2026-09-213.74m8
2026-09-203.37m4
2026-09-191.12m3
2026-09-181.12m1
2026-09-132.29m11
2026-09-121.06m6
2026-09-113.77m9
2026-09-101.05m2
2026-09-093.75m5
2026-09-083.76m2
2026-09-071.04m1
2026-09-053.77m4
2026-09-033.32m6
2026-09-013.78m1
2026-08-311.02m3
2026-08-293.78m7
2026-08-253.79m19
2026-08-163.95m3
2026-08-124.00m4
2026-08-11995.3k9
2026-08-092.64m13
2026-08-083.28m13
2026-08-064.10m4