Small Artillery Battery
Tech IProjectile BatteriesSmall Artillery Battery — Tech I Mobile Projectile Sentry (Starbase) — EVE Online item
Fires a barrage of medium projectiles at those the Control Tower deems its enemies. Effective at long-range bombardment and can do some damage, but lacks the speed to track the fastest targets.
Jita Price
4.00m ISK
90d Avg
2.90m ISK
Volume
500 m³
Base Price
500.0k ISK
Jita Market (90d)
Latest Price (2026-07-02)
4.00m ISK
90d Average
2.90m ISK
90d High
4.50m ISK
90d Low
1.50m ISK
Avg Daily Volume
13
Variations(3)
Small Artillery Battery
Tech I
Angel Small Artillery Battery
Faction
Domination Small Artillery Battery
Faction
Recent Destructions
View all →Small Artillery Battery· Unknown Pilot · Manjonakko
3.15mSmall Artillery Battery· Unknown Pilot · Manjonakko
3.15mSmall Artillery Battery· Unknown Pilot · J113227
4.33mSmall Artillery Battery· Unknown Pilot · J113227
4.33mSmall Artillery Battery· Unknown Pilot · J113227
4.33mSmall Artillery Battery· Unknown Pilot · J113227
4.33mSmall Artillery Battery· Unknown Pilot · J113227
4.33mSmall Artillery Battery· Unknown Pilot · J114749
1.60mSmall Artillery Battery· Unknown Pilot · UEXO-Z
4.49mSmall Artillery Battery· Unknown Pilot · UEXO-Z
4.49mRequired Skills
Attributes
Structure HP100,000
Powergrid Usage101250 MW
Radar Strength500,000
Charge Size2
Max Locked Targets1
Shield HP25,000
Armor HP375,000
Shield Recharge Time2500.0s
Signature Radius6000 m
Max Target Range250 m
Charge Group83
Reprocessing Materials
Properties
Type ID16631
Group ID426
Category ID23
Mass50,000,000 kg
Volume500 m³
Capacity50 m³
Portion Size1
Radius400 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-024.00m10
2026-07-013.99m18
2026-06-293.15m7
2026-06-274.33m8
2026-06-262.15m5
2026-06-253.27m5
2026-06-241.60m5
2026-06-232.24m26
2026-06-224.39m2
2026-06-214.31m2
2026-06-204.40m8
2026-06-174.49m6
2026-06-164.49m15
2026-06-154.49m12
2026-06-144.48m92
2026-06-131.60m2
2026-06-111.61m5
2026-06-101.61m4
2026-06-094.49m7
2026-06-074.11m37
2026-06-061.60m1
2026-06-051.60m2
2026-06-043.87m12
2026-06-033.87m4
2026-06-013.72m32
2026-05-303.87m7
2026-05-293.87m6
2026-05-283.87m4
2026-05-242.56m9
2026-05-233.03m23