Republic Fleet 280mm Howitzer Artillery
FactionSmallRepublic Fleet 280mm Howitzer Artillery — Faction Projectile Weapon (Module) — EVE Online item
Rocket-assisted artillery projectiles designed for long-range combat. It is the most powerful projectile weapon able to be fitted onto frigates.
Must be loaded with any of the following projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, or Titanium Sabot.
Must be loaded with any of the following projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, or Titanium Sabot.
Jita Price
15.63m ISK
90d Avg
20.95m ISK
Volume
5 m³
Base Price
7.5k ISK
Jita Market (90d)
Latest Price (2026-10-04)
15.63m ISK
90d Average
20.95m ISK
90d High
36.95m ISK
90d Low
9.64m ISK
Avg Daily Volume
3
Variations(9)
280mm Howitzer Artillery I
Tech I
280mm 'Scout' Artillery I
Tech I
280mm Carbine Howitzer I
Tech I
280mm Gallium Cannon
Tech I
280mm Prototype Siege Cannon
Tech I
280mm Howitzer Artillery II
Tech II
280mm 'Jolt' Artillery I
Storyline
Domination 280mm Howitzer Artillery
Faction
Republic Fleet 280mm Howitzer Artillery
Faction
Recent Destructions
View all →Ishtar· Nan Evans · AD017
3.73bOutrider· Scroobius Pip · J115706
546.94mThrasher Fleet Issue· Lyfirea Blaze · RKM-GE
80.70mIshtar· Mormax Isamu · Ihakana
3.56bIshtar· Nan Evans · AD012
4.13bIshtar· Lenau · Nuken
3.69bIshtar· czmashiro · Sazilid
2.72bIshtar· Yantinen Ohaya · AD074
1.68bIshtar· Yantinen Ohaya · AD043
2.08bTholos· Flugkall · Mara
355.60mRequired Skills
Attributes
Structure HP40
Powergrid Usage11 MW
CPU Usage13 tf
Charge Size1
Charge Group83
Reprocessing Materials
Properties
Type ID16053
Category ID7
Mass5 kg
Volume5 m³
Packaged Volume5 m³
Capacity0.05 m³
Portion Size1
Radius20 m
Meta Level7
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0415.63m1
2026-10-0310.64m1
2026-10-0220.17m5
2026-10-0110.64m2
2026-09-2810.63m2
2026-09-2723.88m11
2026-09-2510.63m1
2026-09-2432.61m2
2026-09-2310.62m1
2026-09-2010.63m1
2026-09-1931.99m4
2026-09-1613.75m3
2026-09-1510.63m1
2026-09-1420.00m1
2026-09-1334.95m2
2026-09-1234.87m6
2026-09-1110.59m1
2026-09-1010.60m1
2026-09-0910.61m2
2026-09-0831.82m8
2026-09-0710.60m1
2026-09-0634.30m8
2026-09-0434.80m2
2026-09-0333.22m6
2026-09-0210.54m1
2026-09-0134.84m4
2026-08-3010.00m2
2026-08-2724.95m11
2026-08-2518.52m7
2026-08-2424.90m3