Dread Guristas Heavy Missile Launcher
FactionHeavy LaunchersDread Guristas Heavy Missile Launcher — Faction Missile Launcher Heavy (Module) — EVE Online item
Market/Ship Equipment/Turrets & Launchers/Missile Launcher Heavy/Dread Guristas Heavy Missile Launcher
Designed for long engagements between medium sized ships. Slow firing rate, but makes up for it with a large missile capacity.
Jita Price
103.47m ISK
90d Avg
114.12m ISK
Volume
10 m³
Base Price
15.0k ISK
Jita Market (90d)
Latest Price (2026-09-28)
103.47m ISK
90d Average
114.12m ISK
90d High
140.00m ISK
90d Low
95.04m ISK
Avg Daily Volume
7
Variations(12)
Heavy Missile Launcher I
Tech I
XR-3200 Heavy Missile Bay
Tech I
'Malkuth' Heavy Missile Launcher I
Tech I
Advanced 'Limos' Heavy Missile Bay I
Tech I
'Arbalest' Heavy Missile Launcher
Tech I
Heavy Missile Launcher II
Tech II
'Undertaker' Heavy Missile Launcher
Storyline
Domination Heavy Missile Launcher
Faction
Dread Guristas Heavy Missile Launcher
Faction
Caldari Navy Heavy Missile Launcher
Faction
Republic Fleet Heavy Missile Launcher
Faction
True Sansha Heavy Missile Launcher
Faction
Recent Destructions
View all →Tengu· flydialect · KLY-C0
1.82bGila· Yurei Takane · 3T7-M8
5.08bGila· Shadowess · Uotila
6.10bLoki· XJIE6YLLIEK 6OPOgUHCKUU · DAI-SH
2.69bLoki· balumonk · CR-0E5
3.33bGila· Matabar Anasazie · AD198
4.16bLoki· XJIE6YLLIEK 6OPOgUHCKUU · 5-O8B1
2.26bGila· Yurei Takane · AD087
5.90bLoki· Mana Loutte · RO0-AF
1.47bGila· Jacob Okanta · AD075
4.77bRequired Skills
Attributes
Structure HP40
Powergrid Usage90 MW
CPU Usage55 tf
Charge Group385
Reprocessing Materials
Properties
Type ID13922
Category ID7
Volume10 m³
Packaged Volume10 m³
Capacity1.35 m³
Portion Size1
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-09-28103.47m2
2026-09-2795.82m1
2026-09-26109.24m8
2026-09-2595.58m6
2026-09-24118.75m2
2026-09-22110.57m10
2026-09-21119.79m13
2026-09-20115.54m17
2026-09-1996.96m30
2026-09-18118.90m1
2026-09-17100.50m5
2026-09-16111.82m5
2026-09-15108.53m6
2026-09-14105.91m13
2026-09-1399.86m14
2026-09-12101.20m2
2026-09-11104.42m7
2026-09-1099.35m14
2026-09-0995.82m5
2026-09-08104.23m2
2026-09-07109.59m19
2026-09-06112.63m3
2026-09-05102.43m10
2026-09-04109.99m7
2026-09-03112.31m8
2026-09-0298.75m5
2026-09-0195.28m1
2026-08-31113.70m1
2026-08-30108.31m7
2026-08-29100.60m11